Introduction
Activity List
1. Referral
1.1 Initial Screening
1.2 Discovery Call Preparation
1.3 Placed on Hold
1.4 Not Proceeding
2. Pre-Qualification
2.1 Planning Investigation
2.2 Site Survey
2.3 Moddie Design Pack
2.4 Moddie Design Portal
3. Building Permit
3.1 Scoping
3.2 Standard Documents
3.3 Plan Preparation
3.4 Additional Consents
3.5 Engagement Documents
3.6 Submission
4. Construction
4.1 Product Manufacturing
4.2 Delivery
4.3 Installation
5. Non-Conformance
5.1 Quality Assurance
5.2 Variation
6. Quote
6.1 Quote
6.2 Variation Quote
7. Progress Claim
7.1 Progress Claim
5. Moddie > Non-Conformance Activity
It involves issue identification, root causes analysis, corrective actions, and resolution tracking to maintain quality.
Sub-Activity
Sub-Activity Description
5.1. Quality Assurance
We check that all work meets our standards. If something isn’t right, we fix it and record what was done. ** Please prepare checklist
5.2. Variation
If the client requests a change or something unexpected comes up, we document it and update the cost or timeline as needed.
Ready to Leave?
×
Select "Logout" below if you are ready to end your current session.