2. Moddie > Pre-Qualification Activity


This activity confirms that the referred lead meets the basic eligibility requirements and that a Moddie installation is viable for their budget and property constraints.

Sub-Activity

Sub-Activity Description

2.1. Planning Investigation

This process is raised when a potential planning issue has been identified and we require written planning advice from council. As it incurs cost, it should only be raised after we have completed initial contact with customer.

2.2. Site Survey

We look at the property to check access, land conditions, and anything that might affect the build.
*** Note this is same process as PSN spa survey, please check if any changes required
*** TO DO
*** Advise whether same process can be used for spas and Moddies (preferable) or if separate processes needed *** Suggest get Bianca to review this.

2.3. Moddie Design Pack

Preparation of Design Pack

2.4. Moddie Design Portal

Preparation of Design Pack